‘Ridiculous’ Shoreham riverbank work must have cost a fortune – and is already in need of repair
The railings are all chrome, and will rust within a few months due to the sea air, but more importantly the fancy design of thin chrome railing strips, which must have cost a fortune, are totally unsuitable.
We have spotted several children standing on these within days of the work finishing, and they have of course bent.
Advertisement
Hide AdAdvertisement
Hide AdEven worse, an overweight man who had been digging for bait decided to climb back onto the path, and he broke one section completely.
This no more than a couple of weeks after the work was completed. Today, repairs are being carried out. Several men once again standing looking confused, and at what cost I wonder ?
This is a very popular walkway used by the public, and many walking groups.
So after depositing tons of soil for a supposed flower bed, what do we get? We get a few handfuls of grass seed, as they have ‘run out of money’. We the public have far more common sense, and could save thousands of pounds of public funds if we had a say.
Advertisement
Hide AdAdvertisement
Hide AdOne final observation. Forty, 50, maybe more hand-made flower boxes have been placed on the new flood defence walls, and a few plants placed in every box. These will soon be full of weeds, and must have cost a fortune. What a farce.
David Graves
Riverside, Shoreham Beach
---
• Share your views – email [email protected], [email protected] or [email protected].
---
---
• Benefit from an ongoing discount on your Herald or Littlehampton Gazette by joining our voucher membership scheme. Once you’ve subscribed we’ll send you dated vouchers which can be exchanged for your paper at any news outlet. To save money on your Herald or Littlehampton Gazette simply click here.